SUMMARY:Injection and fast extraction systems for J-PARC main ring
DTSTART;VALUE=DATE-TIME:20240418T032000Z
DTEND;VALUE=DATE-TIME:20240418T034000Z
DTSTAMP;VALUE=DATE-TIME:20260907T002259Z
UID:indico-contribution-172@indico.nsrrc.org.tw
DESCRIPTION:Speakers: Koji ISHII (KEK/J-PARC)\nIn 2023 J-PARC Main Ring ac
 hieved 750kW beam power for T2K neutrino experiment. The 750kW is the init
 ial design value of MR and it means to reach a great milestone. In this ta
 lk\, I will briefly introduce the key technologies needed to achieve this 
 750kW. One of the key technologies is the injection and extraction systems
 . The kicker magnet and power supply\, septum magnet and power supply used
  in the systems will also be mentioned.\n\nhttps://indico.nsrrc.org.tw/eve
 nt/16/contributions/172/
LOCATION: Research Building A119